Project
Information
Borgata North Tower Expansion
Description: 350,000
square foot methane barrier
beneath podium, which included
additional gaming area, three
upscale restaurants and a food
court. Methane barrier consisted
of 20 mil reinforced geomembrane
laminated to a 6 oz. geotextile
manufactured by Reef Industries.
Methane barrier had to sealed to
over 700 pipe penetrations,
2,700 pipe hangars, and 8,500
lineal feet of concrete building
perimeter and pile cap batten
attachments.
Site Contractor: Kline
Construction, Galloway, NJ, POC:
Tim Fetter 609-652-3000
Liner Installation
Subcontractor: Atlantic Lining
Co., Inc., Lawrenceville, NJ
08648
Date: October 2005 –
January 2006
Engineer: Paulus,
Sokolowski and Sartor (PS&S)
732-584-0217 |